
SAFETY / INCIDENTS
Omrop Fryslân
Minor arrested after possible threat with knife at Leeuwarden station
Work on Hollandiatunnel at Scharsterbrug will take longer The traffic using the Hollandiatunnel under the A7 between Scharsterbrug and Joure will have to wait another week. Something went wrong when pouring the concrete retaining wall, which means that some of the work has to be done again.
Share
Read full article at Omrop Fryslân ↗




